START Conference Manager    

2025 PCI DESIGN AWARDS

Buildings Submission Page


Important: The competition is running a double-blind review process. That is the judges will not have access to your personal information, that of your project team members or your actual project name. In preparing your project summary, do not include any information which could reveal your identity, or that of your project team or project. The "Title of Project" section of your submission should not contain the actual project title, but rather a generic one (e.g. office building). You may enter the actual project title in the "Structure Name" section, which the judges will not be able to see. In the project description of your submission, you should eliminate all direct references that could provide a judge with your identity or that of your project. This will help our effort to maintain a fair, double-blind reviewing process - and to consider all submissions equally. If you submitted a project last year and it did not win a 2024 PCI Design Award, and it was completed after January 1, 2022, you can resubmit that project to 2025 PCI Design Awards. Please email PCIDesignAwards@pci.org with last year's project submission number and we will copy that project over to 2025 PCI Design Awards. You will need to pay the $500 submission fee. Thank you.

To revise a previous submission, please type the submission passcode below, and press the ENTER button.

   

If you lost the passcode for your submission, please click HERE.


Enter Generic Title of Project:   
(please note that the Project Title will be disclosed to judges)

Structure Details
(this data will not be disclosed to judges)
Structure Name (*)
Enter address of project (*)
Enter city of project (*)
Enter state of project (U.S. only) (*)
Enter project's ZIP Code (U.S. only) (*)
Enter country of project (*)

Submitter:

First Name (*)  
Last Name (*)  
Company Name (*)  
Project team role (e.g. Architect)  
Job Title (*)  
Phone (*)  
Fax  
Email (*)  
Country (*)  
Address (*)  
Address  
Address  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  
PCI- Certified Precast Concrete Producer:

First Name (*)  
Last Name (*)  
Company Name (*)  
Phone (*)  
Email (*)  
Country (*)  
Address (*)  
Address  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  
Architect:

First Name (*)  
Last Name (*)  
Company Name (*)  
Phone (*)  
Fax  
Email (*)  
Country (*)  
Address (*)  
Address  
Address  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  

If a required field does not apply to your project, just enter N/A into the text boxes below. For the email, please write na@na.com or na@gmail.com.

Engineer of Record:

First Name (*)  
Last Name (*)  
Company Name (*)  
Phone (*)  
Fax  
Email (*)  
Country (*)  
Address (*)  
Address  
Address  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  
Structure Owner:

First Name (*)  
Last Name (*)  
Company Name (*)  
Phone (*)  
Fax  
Email (*)  
Country (*)  
Address (*)  
Address  
Address  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  
PCI Associate/Supplier Member:

First Name (*)  
Last name (*)  
Company Name (*)  
Phone (*)  
Fax  
Email (*)  
Country (*)  
Address (*)  
Address  
Address  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  
PCI-Certified Erector:

First Name  
Last name  
Company Name  
Phone  
Email  
Country  
Address  
Address  
City/Town  
State/Province  
Zip/Postal Code  
Precast Concrete Specialty Engineer:

First Name  
Last Name  
Company Name  
Phone  
Email  
Country  
Address  
Address  
City/Town  
State/Province  
Zip/Postal Code  
General Contractor:

First Name (*)  
Last name (*)  
Company Name (*)  
Phone (*)  
Email (*)  
Country (*)  
Address (*)  
City/Town (*)  
State/Province (*)  
Zip/Postal Code (*)  
Additional Team Member:

First Name  
Last name  
Affiliation/organization  
Role in Project  
Job/Function Title  
Phone  
Mobile  
Email  
Country  
Address  
City/Town  
State/Province  
Zip/Postal Code  

Submission Subcategories:

Please enter the primary use subcategory of the structure. Projects located outside of the United States must select 'IB - International Buildings Structure.'
Select use subcategory (*):  

Project Summary: (*)

Enter a project summary. Include overview of project, size (number of spaces if a parking structure), circumstances, if precast was an alternate or original design, specific goals of the project, what was used to meet goals in using precast, why use precast, the cost, time, key design challenges, goals and strategies, innovative materials used, etc.

 

Project cost data (in USD):
Enter total project cost (e.g. 1,000,000) (*)
Enter total square footage of project (e.g. 5,000) (*)
Cost of the precast concrete (e.g. 1,000,000) (*)

Schedule Information
Schedule information (Please include project timeline e.g project start date, precast erection start date, precast erection completion date, project completion date) (*)


Design challenges
Enter summary of key project challenges, highlight where precast concrete contributed to overcoming them. (*)


Innovations/accomplishments
Enter a summary of innovations or accomplishments. What innovative materials were used, resiliency goals, community goals. (*)


Project details
Please list a summary of the precast concrete components, include quantity and dimensions for each. Were there any rating systems used. (*)

Describe the finishes used (e.g. sandblast) (*)
Materials used for the structural frame (*)  
Number of stories 
Project delivery method: (*)  
Was BIM used for the precast? (*)

Please elaborate and provide more details on how precast concrete was used to meet project goals.
Provide details here: 


If ultra-high-performance-concrete (UHPC) was used on this project, please elaborate and provide more details on how UHPC was used on this project.
Provide details: 


If sustainable choices and options were used on this project, please elaborate and provide more details on how precast concrete contributed to sustainability on this project
Provide details: 


Special Awards: I would like to apply for the following special awards.

  Sustainable Design Award  
  All-Precast Concrete Solution Award  
  Harry H. Edwards Industry Advancement Award  
  Building Information Modeling (BIM)  

Provide additional information required for any special awards selected above. A list of additional information required for each special award can be found on the Design Awards section of the PCI website. (*)



Keywords/Topics: Check all that apply.
  Improved thermal performance/reducing energy consumption  
  Increased open space of floor plate (e.g. reduce no. of columns, obstructions, etc.)  
  Aesthetic versatility (helped meet project’s aesthetic requirements)  
  Improved storm resistance  
  Helped meet sustainability goals  
  Improved fire resistance  
  Improved safety and security to occupants  
  Cost-Benefit  
  Improved blast resistance  
  Minimized construction site disturbance (e.g. tight site)  
  Increased service life/durability  
  Contributed to improved IEQ (e.g. no mold, no VOCs, rapid enclosure…)  
  Structural versatility (precast used as at least part of the structural system)  
  Accelerated construction (speed of construction)  
  Reduced long-term life-cycle costs  
  Resilient design  
  Ultra-high-performance concrete (UHPC)  

Photo/Image Upload
Please submit 5 to 10 photos of the project. No pdf or Word documents of photos will be accepted. Capture the uniqueness of your project and how the project fits into its surroundings. Phases of the project with highlights of the precast concrete are encouraged. Professional photos are highly recommended. Please ensure the Image Name/Description on the Image License Request Form matches each image description provided for each image below.
Image 1 description (*)
Image 1 file (*)
Image 2 description (*)
Image 2 file (*)
Image 3 description (*)
Image 3 file (*)
Image 4 description (*)
Image 4 file (*)
Image 5 description (*)
Image 5 file (*)
Image 6 description 
Image 6 file 
Image 7 description 
Image 7 file 
Image 8 description 
Image 8 file 
Image 9 description 
Image 9 file 
Image 10 description 
Image 10 file 

Image License Request Form must be completed and signed (*)

Please do not forget to submit your project submission entry fee of $500.00 by July 25, 2024.

START Conference Manager (V2.61.0 - Rev. 6999)